No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | PT.YURA ENGINEERING | 31.433.165.3-432.000 | Rp. 194.430.390,00 | Rp. 194.430.390,00 | Rp. 194.342.390,00 |
No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | PT.YURA ENGINEERING | 31.433.165.3-432.000 | Rp. 194.430.390,00 | Rp. 194.430.390,00 | Rp. 194.342.390,00 |