No Nama Peserta K A T ST P PT HN H P PK Alasan
1 PT. BUMI MADANI - 03.178.300.4-015.000 73,83 Rp. 114.796.000,00
Rp. 114.796.000,00
2 PT. DELIMA LAKSANA TATA - 01.394.418.6-013.000

3 CV. TRIGIL - 70.996.286.4-821.000

4 CV. FATEK ENGINEERING CONSULTANT - 03.263.211.9-822.000

5 CV. LAUTAN ANUGERAH - 03.282.727.1-044.000

6 PT. Bina Jasindo Sainstek - 21.006.328.5-024.000

7 PT. GRAHA BARA LESTARI - 02.004.268.5-015.000

8 PT. TURBA KALIMAL KONSULTAN - 66.597.150.3-005.000

9 CAKRA GATRA UTAMA. PT - 01.639.469.4-801.000

10 PT. PARADHIGUNA DWIPANTARA LOKA - 72.003.128.5-822.000

11 CV. Mora Bintang Elektrindo - 72.676.577.9-008.000

12 CHILETAMA INDRAWIRASTA - 01.395.570.3-028.000

13 Cv. Aslamindo Perkasa - 66.564.774.9-048.000

14 PT.DIAN BAGUS KARYA - 75.352.175.6-029.000

15 CV. Sihar Putra - 02.359.854.3-008.000

16 PT. ULTIMATE CONSTRUCTION MANAGEMENT - 21.086.449.2-016.000

17 CV. BINA KARYA CIPTA - 03.290.321.3-101.000

18 PT. SURYA MARZQ KONSULTINDO - 01.812.788.6-003.000

19 PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • HN Hasil Negosiasi
  • SH Skor Harga
  • SA Skor Akhir
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak